Wind Farms in Thailand - Geotechnical Calculations for the Final Design of the Shallow Foundations

In 2018 and 2019 three wind farms with each 30 wind turbines with a hub height of 156.5 m were erected in the Nakhon Ratchasima Province in Thailand, using the Hybrid Tower of Max Bögl. Each Hybrid Tower consists of precast concrete elements up to a level of about 75 m with a 78 m high steel tower on top of it. The almost 8,000 precast concrete elements were mainly produced in a mobile factory of Max Bögl in Thailand.

.....

Bauherr

General Electric International, Thailand

Projektdauer

2017 til 2019

Leistungen

  • Evaluation of soil investigations carried out on behalf of the owner
  • Planning of the required additional geotechnical investigations
  • Supervision of the additional geotechnical investigations
  • Modelling of sub soil for geotechnical calculations
  • Geotechnical calculations for the final design of the shallow foundations
  • Supervision of the earth works for the foundations incl. recommendations for the hard stands and crane pads